Nudgee Transfer Station


2015

NUDGEE TRANSFER STATION – RESOURCE RECOVERY CENTRE

Brisbane City Council (BCC) owned four Waste Transfer Stations (WTS) across Brisbane which were originally developed with a focus on the efficient disposal of waste, as opposed to the recovery and re-use of materials or reduction of landfill waste.  

Current waste reduction targets have influenced BCC to redevelop three of the WTS’s to meet reduction targets, increased recycling rates and the material re-use.  To meet current and future waste reduction targets, BCC investigated the redevelopment and upgrade of the Chandler, Willawong and Nudgee WTS sites to incorporate Resource Recovery Transfer Station (RRTS). The waste transfer facility is being operated by Thiess Services

Challenges to the project includes:

  • Encountering rubbish/unsuitable and disposing it properly
  • Traffic Management – Night works to keep traffic open at daytime.
  • Subgrade treatment due to area – dump site.
     

PROJECT HIGHLIGHTS – ROADWORKS

  • 3 layers of Pavement materials – 3,500m3
  • Prime – 5.700m2
  • Asphalt 25mm – 1,200tonne
  • Roadsigns – 8nos
  • Culverts 300mm to 900mm diam – 801m
  • Field Inlets & Manholes – 18 nos.
  • Kerbing works – 470m
  • Subsoil drains – 470m


EARTHWORKS

  • 2,100m3 excavation
  • 5,700m2 subgrade preparation works


OTHERS

  • Gabion and rock mattress – 90m2
     

Contract Value: $1,300,000


  • Projects

  • Contact

    Inquiries

    For any inquiries, questions or commendations, please call (07) 3829 1577 or fill out the following form





  • Head Office

    Perry O’Brien Engineering Pty
    German Church Road Quarry
    505-609 German Church Road
    Redland Bay, QLD 4165

    Phone (07) 3829 1577
    Email admin@perryobrien.com.au

  • Postal address

    PO BOX 3777
    Victoria Point West Qld 4165

  • ABN 39 077 375 207

  • Suppliers